Define the Performance Requirement
State the required surface-resistance range, test method, acceptance conditions and environmental conditions. General fire or physical ACP reports should not be used as evidence of anti-static performance unless the report explicitly covers that property.
Coordinate the Complete System
The local project team remains responsible for grounding, joints, substrates, penetrations, cleaning procedures and installation. Review the related Anti-static ACP Product Page for panel specification and factory-processing inputs.
Information Required for a Quote
Send the application, performance criteria, panel build-up, dimensions, quantity, fabrication drawings, fire requirement, destination and documentation needs.